Latest verified update · 11 October 2026

Roofing has started. The naturehood is growing.

Reviewed 3 November 2026. The latest documented checkpoint shows residential construction, farm expansion, orchard development, and trail preparation in progress. The July 2026 community update separately documents the solar farm, security, internet connectivity, and community farm; full estate-wide delivery remains in progress.

01

Foundation established

The Vision & Land Acquisition

The project begins with land acquisition and a master-planned naturehood vision, connecting residential ownership, agriculture, outdoor living, and community infrastructure.

Land & community

Master site acquisition and the definition of Green Paradise’s development area.

Planning the naturehood

Residential neighbourhoods, outdoor areas, a community farm, and supporting commercial and recreational districts form the master vision.

02

Reported complete · January 2026

Approvals, Design & Allocation

The January 2026 construction update records government approvals, finalized layouts, architectural drawings, and plot allocations.

Regulatory groundwork

Government approvals completed; layout and planning finalized.

Technical design

Engineering details for waste management, stormwater, and roads; architectural drawings; mechanical and electrical plans finalized and approved.

Owner readiness

Physical and virtual allocations completed, alongside house designs, 3D modelling, and development levy cost analysis.

03

January 2026 checkpoint

Gatehouse, Access & First Construction

Site works move from planning into visible construction.

Entrance & perimeter

The update reports the gatehouse at approximately 85% complete and initial community fencing started.

Road access

Access roads opened through road clearing. This is distinct from completed estate-wide paving.

First home & farm

The first residential home was reported at approximately 40%; the first community was defined and farm work had begun.

04

7 March 2026

First Home: Structure & Everyday Living

A first-floor walkthrough documents the emerging home layout and structural work.

Structural assembly

Precast wall panels assembled, lintels completed, formwork prepared for beams, and preparation for decking.

Indoor meets outdoor

The walkthrough shows the planned porch, kitchen, living and dining spaces, guest bedroom, laundry, outdoor lounge, and backyard.

05

May 2026

Multiple Homes & Local Production

Construction expands beyond the first house while site production and services advance.

More homes taking shape

The May updates document House #2 foundations and early work on House #3, plus estate fence trench excavation and road clearing.

Decking & services

Duplex precast decking completed and curing; plumbing, electrical conduit, and earthing work progressing.

Construction supply & growing spaces

On-site cement block production started, alongside continued bungalow work and greenhouse development.

06

July 2026 community update

Solar, Security & Community Farm

The July update records established services alongside the growing neighbourhood.

Off-grid solar & connectivity

The presentation reports a solar farm installed and internet connectivity established.

Perimeter & security

Phase 1 fencing was reported at 75%, with on-ground security and CCTV documented in the update.

Farm & local production

Community farming, initial landscaping, and on-site concrete block production are documented with progress photographs.

07

October 2026

Orchard, Farm & Growing Neighbourhood

Founder updates document orchard and animal areas, followed by an episode showing nine homes taking shape.

3 October · Episode 17

The founder’s orchard and animal update documents the agricultural side of the community.

7 October · Episode 18

“9 Homes Taking Shape” records the growing residential construction activity. These are homes under development, not nine completed handovers.

08

11 October 2026 · latest verified update

Roofing & The Transition to Community

The latest verified founder update records roofing starting, further walling milestones, and continued work on outdoor spaces.

Duplex #3 & Bungalow #3

Ground-floor walling on Duplex #3 completed, with preparation for its next concrete casting stage. Bungalow #3 walling completed.

Roof structures

Roofing work started on duplexes.

Farm, orchard & trails

Community farming and livestock areas expanding; orchard development and walking trail preparation continuing.

Infrastructure still ahead

The founder describes the next phase of estate-wide roads, drainage, electricity and water distribution, sewage, streetlights, and landscaping as work still to be delivered.

09

Anticipated · 19 December 2026

Grand Community Launch

The anticipated grand community launch is December 19, 2026. Residential construction and the preparation of supporting community infrastructure remain the focus ahead of launch.

Launch preparation

Continue house construction, roofing, outdoor spaces, and supporting infrastructure in line with the development programme.

Delivery status

The launch is a target milestone. Final handover dates and the operational availability of each amenity will be confirmed by the project team.

Follow the documented journey

The construction figures above are dated checkpoints from the project update headed “JAN 2026 CONSTRUCTION UPDATE” and the founder’s Green Paradise video series.

Where Would You Like to Go Next?

Take the next step toward ownership, land banking, or wealth creation.