From first plans to a living naturehood
Explore the documented progression of Green Paradise through construction updates and founder walkthroughs.
Latest verified update · 11 October 2026
Reviewed 3 November 2026. The latest documented checkpoint shows residential construction, farm expansion, orchard development, and trail preparation in progress. The July 2026 community update separately documents the solar farm, security, internet connectivity, and community farm; full estate-wide delivery remains in progress.
01
Foundation established
The project begins with land acquisition and a master-planned naturehood vision, connecting residential ownership, agriculture, outdoor living, and community infrastructure.
Master site acquisition and the definition of Green Paradise’s development area.
Residential neighbourhoods, outdoor areas, a community farm, and supporting commercial and recreational districts form the master vision.
02
Reported complete · January 2026
The January 2026 construction update records government approvals, finalized layouts, architectural drawings, and plot allocations.
Government approvals completed; layout and planning finalized.
Engineering details for waste management, stormwater, and roads; architectural drawings; mechanical and electrical plans finalized and approved.
Physical and virtual allocations completed, alongside house designs, 3D modelling, and development levy cost analysis.
03
January 2026 checkpoint
Site works move from planning into visible construction.
The update reports the gatehouse at approximately 85% complete and initial community fencing started.
Access roads opened through road clearing. This is distinct from completed estate-wide paving.
The first residential home was reported at approximately 40%; the first community was defined and farm work had begun.
04
7 March 2026
A first-floor walkthrough documents the emerging home layout and structural work.
Precast wall panels assembled, lintels completed, formwork prepared for beams, and preparation for decking.
The walkthrough shows the planned porch, kitchen, living and dining spaces, guest bedroom, laundry, outdoor lounge, and backyard.
05
May 2026
Construction expands beyond the first house while site production and services advance.
The May updates document House #2 foundations and early work on House #3, plus estate fence trench excavation and road clearing.
Duplex precast decking completed and curing; plumbing, electrical conduit, and earthing work progressing.
On-site cement block production started, alongside continued bungalow work and greenhouse development.
06
July 2026 community update
The July update records established services alongside the growing neighbourhood.
The presentation reports a solar farm installed and internet connectivity established.
Phase 1 fencing was reported at 75%, with on-ground security and CCTV documented in the update.
Community farming, initial landscaping, and on-site concrete block production are documented with progress photographs.
07
October 2026
Founder updates document orchard and animal areas, followed by an episode showing nine homes taking shape.
The founder’s orchard and animal update documents the agricultural side of the community.
“9 Homes Taking Shape” records the growing residential construction activity. These are homes under development, not nine completed handovers.
08
11 October 2026 · latest verified update
The latest verified founder update records roofing starting, further walling milestones, and continued work on outdoor spaces.
Ground-floor walling on Duplex #3 completed, with preparation for its next concrete casting stage. Bungalow #3 walling completed.
Roofing work started on duplexes.
Community farming and livestock areas expanding; orchard development and walking trail preparation continuing.
The founder describes the next phase of estate-wide roads, drainage, electricity and water distribution, sewage, streetlights, and landscaping as work still to be delivered.
09
Anticipated · 19 December 2026
The anticipated grand community launch is December 19, 2026. Residential construction and the preparation of supporting community infrastructure remain the focus ahead of launch.
Continue house construction, roofing, outdoor spaces, and supporting infrastructure in line with the development programme.
The launch is a target milestone. Final handover dates and the operational availability of each amenity will be confirmed by the project team.
The construction figures above are dated checkpoints from the project update headed “JAN 2026 CONSTRUCTION UPDATE” and the founder’s Green Paradise video series.